Process Map: requirements checklist

The working checklist for a Process Map engagement. Take it into the room.

This page is the template. It improves after every engagement, so it is versioned here rather than copied into a document. The Process Map product record links to this page, and each project uploads its completed instance.

Three pages, three jobs:

This checklist What you must come away with
Capture form Where the answers go. Copy it, fill it in, upload it to the project
Question bank Everything worth asking, to draw on. Most engagements use about a third

Part A capture is one-way

Baseline numbers can only be measured before anything is automated. Miss them and every savings claim afterwards is an estimate against an estimate (OI-007). If a day runs short, cut Part B and keep Part A.

How this is structured

Part Gather For every engagement
A. Findings Volumes, systems, people, where time goes Yes
B. Product readiness Technical detail per automation Only for products you will actually recommend

Part B is deliberately last. Asking mailbox questions on day one for a product you may not recommend wastes the client's time and yours.


Part A: findings

A1. Baseline, and it closes

Numbers, not impressions. "A lot" is not a baseline.

Capture Feeds
Inbound volume per day, by channel Sizing, and the value model
How many need a human response The addressable portion
Current time to first response The before-state
Who handles it, and how long per item The savings model and its multiplier (OI-009)
What currently gets missed or delayed Often the real sale
Rework rate: how often something is redone The strongest saving, and the least claimed

Get the multiplier agreed in the room. "We think this takes four minutes each" written down and agreed is what defends the savings figure later. Their number, not ours.

A2. The process, as it actually runs

Map what happens, not what the manual says.

Capture Why
Trigger: what starts the work Where automation attaches
Each step, who does it, how long The map
Every handoff and wait Waits are usually the biggest loss, and the least visible
Decision points, and the rule actually applied Candidate structured predicates (ADR-0004)
Exceptions, and how often they happen Exception rate decides whether automation is viable at all
What happens when the usual person is away Reveals undocumented dependencies

Chase the exceptions specifically. A process that is 70% standard and 30% exception is a poor automation candidate however painful it feels, and finding that out here is far cheaper than finding it out mid-build.

A3. Systems

Capture Why
Every system in the process, and its version Connector scope
Which are connected to each other today The cross-system join is usually the pitch (OI-006)
Where data is re-keyed between systems Direct automation candidates
Spreadsheets and shadow systems Always present, never mentioned unprompted
Who administers each system Whose cooperation the build needs
Their own reporting: what exists, what they wish existed Dashboard scope

Ask to see the spreadsheets. They are where the real process lives, and nobody volunteers them.

A4. People and approvals

Capture Why
Who would approve automated output Review app users
How quickly they can realistically review Approval expiry, and the closed_manual rate
What happens when that person is unavailable Fail-closed behaviour
Who would resist this, and why The real delivery risk
Their appetite for autonomy, concretely The autonomy ceiling

Ask what they would never let a machine do unsupervised. The answer defines the ceiling more usefully than asking what they would allow.

A5. Commercial and constraints

Capture Why
Any compliance obligation on data or retention Residency tier, retention floor (ADR-0026)
Contractual constraints on where data is processed Inference residency (OI-065)
Existing software contracts, and renewal dates Timing, and displacement opportunities
Who signs off spend, and their threshold Proposal shaping
Anything in flight that would collide with a build Sequencing

Part B: product readiness

Complete only for products you will recommend. Each section is what must be true before that product can be quoted with confidence.

B1. Email triage

Capture Decides
Shared mailbox or personal? Shared is a product. Personal is a permissions problem
Microsoft 365 or Google? Connector
Who else reads and replies to it Reconciliation, since they may reply first (ADR-0032 §6g)
Existing rules, folders and categories Their implicit taxonomy, already written down for you
Walk their last twenty emails and categorise together The vertical template validated against reality
Anything the template does not cover Their per-client additions (ADR-0005)
What "urgent" means to them, concretely Priority rules
Approval surface: review app or mailbox? Per-tenant mode, one only (ADR-0032 §6h)

The twenty-email walkthrough is the highest-value hour of the engagement. It validates the taxonomy against reality, surfaces categories you would have missed, and gives you a labelled set for the eval harness. Do it with the person who currently triages, not with the owner.

B2. Any product touching a job or field-service system

Capture Decides
Job system and version Connector
Accounting system Connector
Can they export customers and jobs to file? Backfill route
Do export IDs match the API's IDs? Whether file backfill works at all
Job or reference number format The pattern is per-client config
Roughly how many customers, and open jobs Backfill duration
Rough total historical jobs Whether backfill is a day or a fortnight
API rate limits on their plan Sync cadence, and backfill schedule

The ID question is the one that quietly decides the price. If a file export uses different keys from the API, backfilled rows cannot be matched to later updates, and the file route is dead. Confirm it against a real sample rather than accepting an answer.

Backfill is a phase, not a step. Against a 2,000 calls per day cap, thousands of jobs is days of calendar time. Plan it as background work running while the rest is built, rather than discovering it the week before launch.

B3. Document retrieval

Only if document_request is expected to be a meaningful share of their volume, which it usually is.

Capture Decides
Where the last certificate they issued is, shown not described Everything below. Watch them find it
Attached to the job in the system, or filed elsewhere? Whether retrieval is possible at all
If a folder, is it network or local? Local means unreachable
Does the job record have a document type field? Otherwise a job with a dozen attachments is unpickable
Actual file names, seen not described CoC_J4471.pdf works. scan001.pdf does not
Filed by hand, or by something automatic? Habit-kept conventions break silently
Typical attachment count on a finished job Photos, variations, invoices and certificates, mixed

Four things must all be true

The document must be in a reachable system, identifiable among the other attachments, reliably linked to the job, and the mail connector must be able to attach files.

The first two fail most often, and either one alone kills it.

document_request is the highest-volume automatable category, and it is nearly worthless without the attachment. "Your certificate is ready, log in and find it" saves nobody anything.

If retrieval is impossible, the fallback is a reply telling the customer it is ready and asking the office to send it. That is a small saving rather than a large one, and it must be priced as the small one.

B4. Any product producing reporting or a dashboard

Capture Decides
Which metrics, named and defined by them Signed off before the first run (OI-008)
What "live" means to them, as a number Sync cadence (OI-005)
Who reads it, and how often Curated views versus self-serve (OI-030)
What their current system already reports Verify the gap rather than assert it

After the engagement

Output Goes to
Completed checklist Uploaded to the project
Findings and recommendations The report, being the paid deliverable
Baseline numbers and agreed multiplier Recorded, because they cannot be recaptured
Selected items A new opportunity and proposal
Technical readiness answers Tenant config at provisioning (configuration reference)

The report must stand alone

They paid for it, and it has to be worth the money even if they do not proceed. Every number in it should trace to something recorded on the day. A recommendation resting on "we assumed roughly 40 emails a day" is not defensible to someone who paid for the analysis.